Credentials.

Contractor: GPUmbH, Saarwellingen

Costumer: Smart, Hambach
Project : anderbodyweldingline
Activity: Programming of robots and Optimise of Process

Contractor: H.Herche GmbH, Ausburg

Costumer: H.Herche GmbH
Project : Programm for processing of orders
Activity: Projecting and programming of the Software

Contractor: Kleinmichel GmbH, Bernried

Costumer: VW, Shanghai
Project : DVD-Anlage for install the headliner
Activity: Support of commissioning

Contractor: KUKA Systems GmbH, Augsburg

Costumer: Audi, Ingolstadt
Project : Automation of the Presslinie 18 with Robots
Activity: Sidemanagement, commissioning SPS- and Roboterprogramm

Costumer: Audi, Neckarsulm
Project : Nahtabdichten and Auftragen von wässrigem Acrylat
Activity: Sidemanagement, commissioning Roboterprogramm

Costumer: BMW, Munich
Project : Automation of the Presslinie 114 with Robots
Activity: Sidemanagement, commissioning Roboterprogramm and PLC-Programm

Costumer: DaimlerChrysler, Bremen
Project : Automation of the Presslinie 9 with Robots
Activity: commissioning Roboter and PLC-Programm ; training

Project : Automation of the Presslinie 10 with Robots
Activity: commissioning Roboter and PLC-Programm ; training

Costumer: Magna Styr, Graz
Project : NAD and UBS mit PVC des BMW X3 and Saab Cabrio
Activity: Sidemanagement, commissioning Roboterprogramm

Costumer: TAM, Iran
Project : Automation of the Presslinie 2 with Robots
Activity: Cycletimeoptimisation

Project : Destakeranlage for the Pressline
Activity: commissioning SPS and Roboter

Costumer: TATA, Indien
Project : Automation of the Presslinie 3 with Robots
Activity: Sidemanagement, commissioning SPS- and Roboterprogramm

Project : Automation of the Presslinie 2 with Robots
Activity: Sidemanagement, commissioning SPS- and Roboterprogramm

Project : Automation of the Presslinie Hitachi with Robots
Activity: commissioning SPS- and Roboterprogramm

Costumer: Three Ring Co., Macheng China
Project : Frigtionweldigmachine with Robot
Activity: commissioning Reibschweißzelle with Roboter

Costumer: Jinbei, ShenYang China
Project : Automation for Windowglueing
Activity: commissioning cell with Robots

Costumer: VW, Shanghai
Project : Automation for Windowglueing(Touran)
Activity: Umbau, Programming of robots and Prozessoptimisation

Costumer: VW, Braunschweig
Project : Querlenkeranlage PQ35
Activity: Prozessoptimisation Mig/Mag Welding

Contractor: OPS GmbH, Mering

Costumer: Schweißtechnische Lehr- and Versuchsanstalt, München
Project : Laserweldingcell
Activity: commissioning and training

Costumer: Ford, Saarluis
Project : Bodyshop Weldingline Sidepanel 6W C-Max
Activity: Programming of robots

Contractor: Robtec GmbH / Manz GmbH, Reutlingen

Costumer: CPT, Taiwan
Project : Vollautomatic Robotcell for packing and unpacking from glaspanels of TFT-Monitors at cleanroomaerea
Activity: commissioning PLC- and Robotprogramm (Aicocontroll and KRC1)

Contractor: ROBWORLD GmbH & Co. KG, Töging a. Inn / Läpple, Heilbronn

Costumer: BMW, USA
Project : Automation for Tailgate E71
Activity: commissioning Roboterprogramm

Contractor: Schulz Engineering GmbH , Ravensburg

Costumer: DB, Bremen
Project : Bodyshop BR231 Tailgate, Hood, Fender, Doors
Activity: commissioning Roboterprogramm

Contractor: Walter Sebald Wasserstrahlschneiden, Denkendorf

Costumer: Walter Sebald Wasserstrahlschneiden
Project : Robotcell for waterjet cutting of granit and marble
Activity: commissioning and Service

Contractor: SOPS GmbH, Augsburg

Costumer: EBZ / Seat, Matorell
Project : Bodyshop weldingline for Frond
Activity: Offlineprogramming with Robcad

Costumer: VW, Brüssel
Project : Bodyshop weldingline Basegoup front
Activity: Offlineprogramming with Robcad

Costumer: Cadcon, Gersthofen / Audi, Neckarsulm
Project : Rohbauanlage zum Schweißen des C6
Typ of Work: Offlineprogramming with Robcad

Costumer: Tölzer & Wagner / Audi, Neckarsulm
Project : Bodyshop weldingline from sidepanel of C6
Activity: Programming of robots

Costumer: BIAS / Audi, Neckarsulm
Project : Bodyshop weldingline for C6 Frond
Activity: Programming of robots and commissioning of Applikations

Costumer: CTE, Augsburg / DaimlerChrysler, Sindelfingen
Project : Bodyshop weldingline for BR221 : ZB Frond
Activity: Offlineprogramming with Robcad